[1] Rossley N, Aziz F N AA and ChewH C 2014 “Behaviour of Precast Walls Connection Subjected to Shear Load.” J. Eng. Sci. Technol.Spl. Issue Appl. Eng. Sci. 142–50.
[2] RaminVaghei, Farzad Hejazi, Hafez Taheri, Mohd Saleh Jaafar and Abang Abdullah Abang Ali 2014 “Evaluate Performance of Precast Concrete wall to wall Connection”.APCBEEProcedia9 285–90.
[3] Pernaty Ramu, S. M. Abdul Mannan Hussain, B. Tharun Kumar (2014), “Design And Analysis Of Precast Load Bearing Walls For Multi Storey Building Using Etabs”,IJMER journal.
[4] M.J.Gopinathan, K.Subramanian (2013), “High performance and efficiency of joints in precast members”,IJET Journal.
[5] Linus C S Lim, Andrew H Buchanan, “Fire Behavior of Slender Precast Concrete Walls”.
[6] Jesper H. Sørensen, Linh C. Hoang, Gregor Fischer and John F. Olesen,(2015) “Construction-friendly ductile shear joints for precast concrete panels, Conference Paper , January 2015 DOI: 10.14264/uql.2016.1181.
[7] Rohith S, Chidambaram C R, Karthikeyan K* and Helen Santhi M(2017), “A Study on Hybrid Precast walls”, IOP Conf. Series: Earth and Environmental Science 80 (2017) 012037.
[8] Mousa Abdullah Mohammed Hasan, Rahimah Muhamad(2019), “Wall to Wall Horizontal Connection for Precast Concrete Structures”, International Journal of Recent Technology and Engineering (IJRTE) ISSN: 2277-3878, Volume-8 Issue-3S3, November 2019.
[9] Sørensen, J. H., Hoang, L. C., Olesen, J. F., & Fischer, G. (2017). Tensile capacity of loop connections grouted with concrete or mortar. Magazine of Concrete Research, 69(17), 892-904.